Monday, February 23, 2009

23-02-09 Update

Ok, no updates over the last few weeks, we can blame that on the rain!
Since the last post, the Windows have been installed, and the guttering is being installed (nearly complete.) The bricks are onsite, however the SS says the roof will be up before the bricks will be.

Front of house




Master bedroom



Home Theatre windows



Showing the guttering along the front of the garage




Main Bathroom, bath cutout is in..




Showing the rear leisure area




Bricks..




Zero lot side, showing the area behind the garage door and infront of the bathroom. This will be fenced in..

Monday, February 9, 2009

06-02-09 / 09-02-09 Framing

I had called the supervisor on Friday for an update on things to come. He advised there was a surprise for me out on the block. Sure enough, on Friday night we headed out and the frame was up. Went out this afternoon and most of the frame for the roof is up as well.

From the front




Looking in the front door down the hallway




Me in the home theatre. Ceilings are 3.2m high!




Side of the house, showing the kitchen / leisure room



Home Theatre from the side




Showing the Master bedroom / ensuite

Thursday, February 5, 2009

04-02-09 Rooms marked out

Ok, time for an update. Not too much happening from the looks of things, from far away, but from up close, there has been.
On Monday, the external drains and water tap went in. Along with the downpipes
Couldn't see much done on Tuesday
On Wednesday, the fence was put up around the property, and today, it looks like they've marked out the frame on the slab. Its cool seeing the size of the rooms, i'm sure they'll look bigger with walls up!

From the front on Tuesday




Water Connection




Water tap




From the front today




Master bedroom




Foyer / Hallway




Office




Theatre




Bathroom / Laundry




Bedroom 2




Kitchen / Living area




Back of Master room showing ensuite