Since the last post, the Windows have been installed, and the guttering is being installed (nearly complete.) The bricks are onsite, however the SS says the roof will be up before the bricks will be.
Front of house

Master bedroom

Home Theatre windows

Showing the guttering along the front of the garage

Main Bathroom, bath cutout is in..

Showing the rear leisure area

Bricks..

Zero lot side, showing the area behind the garage door and infront of the bathroom. This will be fenced in..

















